Capacity:5t,-50t
Span:5m-35m
Liftingheight:6m-12m
Liftingspeed:7.68, 6.25, 4.62m/min
Semi gantry crane compared with electric single-girder crane, save investment and space, compared with electric hoist gantry crane, save the production space, therefore when selecting ordinary electric single-girder crane or electric hoist gantry crane is not very ideal, semi gantry crane is a better solution.
1, Semi gantry crane structure: by the lifting mechanism and the trolley, single girder and leg, electric cabinet, operating system and safety protection system, etc;
2. Semi gantry crane drive: squirrel-cage motor + machine of decelerate of hard tooth flank, disc brakes, free maintenance;
3. Semi gantry crane operation mode: the cable to hold (IP65, life 500000 times), wireless remote control, driving operation
We designed Semi Gantry cranes with different capacities and spans that will meet your requirements
Lifting capacity |
t |
10 |
|||||
Span |
m |
10 |
12 |
16 |
20 |
||
Lifting height |
m |
6 |
|||||
Travelling mechanism |
Travelling speed |
Ground |
m/min |
20 |
|||
Controling room |
20 30 |
||||||
Motor |
Ground |
|
ZDY(D)122-4/1.5 X2 |
ZDY131S-4/2.2 X2 |
|||
Controling room |
|
ZDR100-4/1.5 X2 |
ZDR112L1-4/2.1 X2 |
||||
Reducer |
|
LDA1 LDAC1 |
LDH LDHC |
||||
Wheel diameter |
mm |
Φ270 |
Φ400 |
||||
Electric hoist |
Type |
|
CD1 MD1 |
||||
Lifting speed |
m/min |
7 7/0.7 |
|||||
Travelling speed |
m/min |
20 (30) |
|||||
Motor |
Lifting |
|
ZD151-4/13 ZDS11.5/13 |
||||
Travelling |
|
ZDY121-4/0.8 X2 |
|||||
Working system |
A4 |
||||||
Steel track recommended |
P38 |
||||||
Power source |
3-Phase 380V 50Hz |
||||||
The crane weight |
Ground |
Kg |
6600 |
7500 |
8350 |
10650 |
|
Controling room |
Kg |
7400 |
8300 |
9150 |
11450 |
||
Max. wheel load |
KN |
78 |
85 |
94 |
103 |
||
Basic dimendions |
H1 |
mm |
1670 |
||||
H2 |
900 |
1000 |
1100 |
1250 |
|||
H3 |
720 |
865 |
920 |
970 |
|||
B |
4800 |
5200 |
|||||
B1 |
3700 |
||||||
B2 |
1600 |
||||||
B3 |
2000 |
2500 |
3000 |
1. Both side of all the steel plate of crane are pretreatment by pretreatment production line, Sand blasting-- Primer spray--Primer drying. Eliminate the innerstress of steel plate, increase the adhesive force of the steel structure. Ensure the appearance and anticorrosion quality.
2. Steel plate cutting adapt whole sets Messer CNC plasma cutting machine from Germany, very fast cutting speed, little deformation, High precision, Deviation could be controlled within 1mm, it insure the raw material at high quality standard and can reach top level in the industry.
3. The welding of main beam adapt high efficiency and intelligent welding robot, Henan Mine Crane CO., LTDare No.1 enterprise who adapt this high technology machine. The welding joint inside of the main beam adapt advanced MAG welding, adapt Ar+CO2 mixed protective gas, The 4 welding joint outside of the main beam adapt automatic submerged-arc fillet welding machine.
4. The welding of main beam adapt radiographic inspection and ultrasonic flaw detection for the welding joint and fillet weld position
5. The welding of end beam adapt double gun gantry submerged arc welding, highly welding quality ensure the stable quality of the crane effectively.
6. Adapt the steel plate rolling drum and wireless steel tube, Henan Mine Crane CO., LTDhas a set of steel plate rolling drum producing and processing line which is industry-leading level. From pre-bending by 1250t press machine, to Edge rolling by three-roller plate roll, at last the longitudinal joint and circumferential joint of drum are welded by automatic welding center and drum processed by heavy duty CNC horizontal machine tool.
1. Weight overload protection device.
2. Top quality long time bearing polyurethane materials buffer.
3. Lifting limit switch
4. Crane travelling limit switch.
5. Trolley travelling limit switch.
6. Voltage lower protection function.
7. Emergency stop system.
8. Wind speed indicator
9. Current overloads protection system and so on!
Design rules for cranes GB/T3811-2008
Safety rules for lifting appliances GB6067.1-2010
General Gantry Crane GB/T14406-2011
Gantry crane manufacturing and tolerances of rail installation GB/T10183-2005
Crane test specification and procedures GB/T5905-1986
Crane electric control equipment JB/T4315-1997
Important application wire rope GB8918-2006
Carbon structure steel GB/T700-2006
Low alloy high strength structure steel GB/T1591-2008
Welding joint radiographic inspection standard JB928-1994
Steel welding joint manual ultrasonic flaw detection way GB11345-1989
Henan Mine Crane could arrange engineer to do supervision of installation, make the load test, do commissioning, training of the buyer's workers, the buyer should be responsible for each of our technician’s accommodation, meals, round-trip tickets, travel expenses and self-security. The engineer’ salary is USD100.00 per day abroad.
1. Quality problems of products sold by our company will be solved as per the “three guarantees” system of our company by the “three guarantees” service team;
2. Related personnel will be sent to the site immediately after receiving quality complaints (by call, letter or oral notice) from clients;
3. Personnel involved in after-sales service shall be serious and considerate in handling the problem to make clients care-free;
4. In addition to solve quality problems, personnel involved in after-sales service shall train clients, answer their technical inquiries and related questions free of charge;
5. Related cost for products with quality problem will be shouldered by our company. Our company charges for quality problems caused by clients (or problems after the warranty term), but the charge will not be higher than the expense (or cost);